Quantity formulas
Volumes, areas and counts use standard construction formulas. Concrete mixes, brick modules and rebar weights follow the values shown in each calculator.
Every calculator shows the formula, the quantities and the unit prices behind the result. Change any price and the estimate updates instantly.
Volumes, areas and counts use standard construction formulas. Concrete mixes, brick modules and rebar weights follow the values shown in each calculator.
The starting prices are typical Vientiane rates. Open the unit-price panel and enter what your supplier quotes. Your prices stay in this browser.
Each calculator adds the waste allowance you choose and uses the labour rate you enter, so the total reflects your site rather than a generic average.
Write everything in metres (3.5 m, not 350 cm). The calculators convert thickness and plaster depth for you.
For a wall, multiply length by height and subtract doors and windows. For a floor, multiply room length by width.
Order a little more than the exact quantity. 5% is normal; 10% is safer for tiles and cutting.
Keep the default. It is a typical Vientiane price, and you can change it later when your supplier quotes.
Land, permits, taxes, transport, scaffolding, formwork, reinforcement and site overheads are not included unless the calculator says so. Always confirm the final quantity with your contractor.
Material prices move with fuel, supply and season. Check your supplier quote before ordering, then update the price fields for a more accurate estimate.
No account and no database. Inputs are calculated in your browser and can be shared through the URL. Edited prices are stored only in this browser.